Residential Off Grid Solar Power Project Stages

Residential Off Grid Solar Power Project Stages
Residential Off Grid Solar Power Project Stages

This video shows typical residential #offgrid #solarpower system project development stages. The images are taken from a work site where #shadowfree space was a constraint.But build with a structure raised high enough to have maximum sunlight coverage and also provide walking space underneath.

The various stages are as below

Stage 1: Site selection for setting up the #Rooftopsolar power system
Stage 2: Site preparation – Initial structure setup to check framework alignment to mount the solar panels.
Stage 3: #SolarPanel Priming – Getting the solar panels un-packed and check for good condition.
Stage 4: Solar Panel Placements on the structure
Stage 5: Getting ready to inter connect the panel cables
Stage 6: Making sure all cable connections are proper to avoid any loose connections.
Stage 7: Setting up and configuring the off grid #solarinverter and the battery for #electricity storage.
Stage 8: Solar Power System completion and electricity generation to help customer with huge savings on electricity bills and continuous power.

Powered by the Sun. Installed by #ProminousSolar
www.prominous.in