SOLAR POWER GENERATION OF 10 MEGAWATTS:

OWNERS: DIVI LABORATORIES, CHOUTUPPAL,NALGONDA DT,TELANGANA

#CAPACITY PROPOSED FOR ESTIMATION: 10 MWP DC SOLAR PV PLANT GRID CONNECTED
*TYPE OF MODULES:CRYSTALLINE SILICON TECHNOLOGY PHOTO VOLATOIC
*A.MODULE WARRENTY : 25 YEARS ( DEPENDING UPON MAKE) GUARANTEED 90%GENERATION EFFICIENCY FOR 10 YEARS& 80% BALANCE 15 YEARS
*B.INVERTERS :CENTRAL/ STRING
*C.BALANCE OF SYSTEM IN PLANT: 5 YEARS
INCLUDES DC AND AC CABLES,LT AND HT SWITCH GEAR,PROTECTION METERS,BATTERY CHARGERS,UPS AND BUS DUCTS
*D.STRUCTURE :FIXED SYSTEM (3 SEASONAL TILT -MANUAL)

#ENERGY OUTPUT ESTIMATED:1.5 MILLION KWH/ MWP NEARLY
(EXACT OUTPUT CAN BE ESTIMATED WITH RADIATION LEVELS IN SPECIFIC LATLONG DETAILS)

#LAND REQUIRED :50 ACRS PLANE ,WITH OUT SUNSHADES FROM EAST TO WEST
&AWAY FROM DUST AND CHEMICAL FUMES

#GRID AVAILABILITY: 33 KV OR ABOVE

#MODE OF CONSTRUCTION : EPC

*E P C COMPANY:

GO GREEN POWER PRIVATE LIMITED , HYDERABAD

MANAGING DIRECTOR: PRASAD MYNENI
MOBILE:9849177007
MAIL:info@go-greenpower.net
SCOPE INCLUDES :THE BEST IN CLASS DESIGN CAPABILITIES, SUPPLY CHAIN MANAGEMENT TO GIVE THE BEST AND OPTIMUM POSSIBLE SOLUTION TO END USER SOURCING &,PROCUREMENT THE TOTAL SYSTEMS,CONCEPT TO COMMISSIONING AND SYNCHRONISATION TO THE GRID
SCOPE EXCLUDS:*LAND REQUIRED
*CONSTRUCTION POWER&WATER
*STATUTORY APPROVALS AND CLEARENCES LIKE PANCHAYAT,INSPECTOR OF FACTORIES,GOVERNMENT OFFICIALS ,SECURITY &SAFETY
*,THIRD PARTY INSURANCE DURING CONSTRUCTION
*TOPOLOGY STUDY
*FENCING
*STREET LIGHTS
*ACCESS ROAD& INTERNAL ROADS
*INTERNAL TRANSMISSION LINES UPTO UTILITY
*ROW ISSUES

EXPERIENCE OF EPC COMPANY:
A TEAM OF POWER GENERATION EXPERIENCE PROFESSIONALS AND MANAGEMENT EXPERTS WHO ARE HANDLING PROJECTS GLOBALLY PARTICULARLY INDIA AND EAST AFRICA.

A 3 MEGA WATT SOLAR POWER GENERATION IS IN OPERATION FROM THE YEAR 2014 AT MARRIGUDA,NALGONDA DT,TELANGANA AND EXPORTING POWER THROUGH THE GRID FOR TATA.

IN THE SAME PREMISES IN 500ACRES 100 MW SOLAR POWER GENERATION IS UNDER IMPLEMENTATION FOR THIRD PARTY SALE THROUGH 132/33 KV SUBSTATION,MARRIGUDA.

SOLAR PARKS UNDER PLANNING STAGE IN INDIA AND ABROAD.

solar panel cleaning water jet runs on solar energy without fuels usage developed inhouse . Tested for 3 MW solar power plant from 6 months,a cost effective,technoeconomical and environment friendly solution. Great demand pickedup already.